We agree on the requirements before we quote

A cable assembly is only as good as the requirements behind it. Our first job is to understand how the assembly will be used, what it must survive and what evidence you need at acceptance.

A project-led conversation

We start from the drawing, a physical sample or a written specification. Where the information is incomplete, we list the open questions instead of filling the gaps with assumptions.

What we review before quoting

  • Application and use environment — device type, patient or operator contact, cleaning and handling conditions.
  • Electrical and mechanical requirements — conductor count, shielding, bend radius, pull force and mating cycles.
  • Interface and pinout — connector type, pin assignment, keying and orientation.
  • Acceptance criteria — which tests, records and documents you need to receive with the shipment.
  • Volume and timeline — prototype quantity, pilot run and expected annual demand.

How the project moves

Six stages, each with a deliverable you can check before the next one starts. Milestones and responsibilities are agreed in writing at the start of the project.

  • Requirements — agreed scope and open questions.
  • Technical review — feasibility, risks and process route.
  • Quotation — price, tooling, lead time and terms.
  • Sampling — prototype assemblies for your evaluation.
  • Validation — agreed tests and acceptance records.
  • Production — pilot run then volume delivery.

Who owns what

You own the device design, the clinical requirements and the regulatory submission. We own the manufacturability of the assembly, the process records and the consistency of what we ship. Anything outside that split is written into the project agreement.

Start a project

Send us a drawing, or a question.

Tell us what the assembly has to do. An engineer reads every inquiry before a price is given.